MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.

Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building, This news data comes from:http://705-888.com
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Group presses DA on delayed fertilizer subsidies
- Bonoan freezes DPWH travel passes
- Appointments panel holds first session
- 1 in 4 people lack access to safe drinking water — UN
- New judge to handle Dengvaxia cases named; hearing set
- Trump move to cut more foreign aid risking shutdown
- LPA east of Surigao del Sur may intensify into tropical depression
- No winner in lotto draws for Aug 23
- President Marcos launches HD Hyundai Shipyard in Subic
- 'I have no resentment,' says Torre after dismissal as PNP chief